⚡ Solar Installation Services in Ghaziabad

Solar Company in Ghaziabad – Rooftop Solar Installation

Fulminous Green Energy designs and installs rooftop solar systems for independent houses, builder floors, housing societies, businesses and factories in Ghaziabad, Uttar Pradesh. Our engineers handle the site survey, design, installation, PVVNL net metering and both the PM Surya Ghar and UP state subsidy paperwork — one accountable team from quote to commissioning.

  • Residential Solar
  • Society Solar
  • Commercial Solar
  • Industrial Solar
  • On-Grid Solar
  • Hybrid Solar

Free site survey • No-obligation written quote • Mon–Sat, 9 AM–7 PM

≈4.1Units per kW per day in Ghaziabad*
₹1.08 LMax combined subsidy on 3 kW (centre + UP)*
25 YrPanel performance warranty*
1–3 DaysTypical home installation time
At a glance

Fulminous Green Energy in Ghaziabad — Key Facts

Company
Fulminous Green Energy (fulminousge.com)
Service
Solar panel installation and rooftop solar EPC
Service area
Ghaziabad city, Ghaziabad district (Loni, Modinagar, Muradnagar) and nearby, Uttar Pradesh
Customers
Independent houses, builder floors, housing societies, commercial and industrial
System types
On-grid, off-grid and hybrid (with battery)
System sizes
1 kW home systems to 100 kW+ commercial/industrial plants
What's included
Consultation, site survey, design, supply, installation, net metering, subsidy support, monitoring, AMC
Electricity distributor
Paschimanchal Vidyut Vitran Nigam Ltd (PVVNL)
Solar resource
≈4.8 kWh/m²/day global horizontal irradiation (Global Solar Atlas)
Head office
B-54 Kings Rd, Nirman Nagar, Jaipur, Rajasthan 302019
Contact
+91 74148 13813 · WhatsApp
Quick answer: Fulminous Green Energy installs rooftop solar for homes, societies and businesses in Ghaziabad, Uttar Pradesh. Each kW produces roughly 115–125 units a month here, so most homes need 3–5 kW on-grid. Eligible homes can combine PM Surya Ghar with the UP state top-up — up to ₹1,08,000 on 3 kW — and we coordinate PVVNL net metering.
What you get

What You Get When You Go Solar With Us in Ghaziabad

Bill-Based Advice

We study a year of PVVNL bills, including your summer peak, before suggesting any capacity.

Safe Installation

Structure, panels, wiring, protection and earth pits fitted and tested by a trained crew.

Homes & Builder Floors

Layouts that work around tanks, mumties and shared roof rights.

Housing Societies

Common-area systems and RWA-ready proposals for high-rise townships.

Business & Industry

Plants for schools, hospitals, warehouses and industrial sheds with daytime loads.

Service After Handover

Monitoring, smog-season cleaning advice and AMC visits.

Local service

Solar Installation Services in Ghaziabad

Fulminous Green Energy provides solar installation services for residential, commercial and industrial customers in Ghaziabad. We look at your electricity use, usable roof space, the right capacity and system type, then install anything from a 3 kW system on a kothi to a larger plant on a factory shed.

Ghaziabad has three very different kinds of residential roof. Older colonies such as Kavi Nagar, Raj Nagar, Nehru Nagar and Shastri Nagar have independent houses and builder floors with RCC roofs, where the roof often belongs to the top-floor owner. Indirapuram, Vaishali, Vasundhara, Raj Nagar Extension and Crossings Republik are dominated by high-rise group housing societies, where the terrace is common property and any system needs RWA approval. And on the city's edges — Loni, Modinagar and Muradnagar — you find larger plots with more open roof space.

The main design questions here are heat, dust and smog. Summer days can reach 45 °C, pre-monsoon dust storms bring strong gusts in May and June, and from October to February the NCR's smog and fog cut sunlight and coat panels in fine dust. We plan structure height, anchoring and cleaning access around all three.

  • Local electricity distributor: Paschimanchal Vidyut Vitran Nigam Ltd (PVVNL)
  • Typical properties we install on: kothis and builder floors, society terraces, schools and hospitals, warehouses and industrial sheds
  • Average daily solar radiation: approx. 4.8 kWh/m²/day (source: Global Solar Atlas, 1,743 kWh/m²/year for Ghaziabad city)
  • Site visit: survey date confirmed when you book
About the service

How a Rooftop Solar System Works on a Ghaziabad Roof

Your rooftop solar plant has one job: produce electricity during the day so you buy fewer units from PVVNL. The panels make direct current (DC); the inverter changes it to the alternating current (AC) your AC units, fridge and motor pump use. Whatever your home does not use at that moment flows out to the grid through a two-way meter and is counted in your favour.

Fulminous Green Energy works as a solar EPC contractor — we engineer, procure and construct the whole plant, so there is one point of responsibility. The work starts with a roof survey: usable area after the water tank and mumty, sun path across the year, shade from nearby towers, slab condition and the distance to your meter. From that we draw the design — how many panels, how they are strung together, which inverter, where the cables run and how the system is protected.

On the equipment side you get ALMM-listed panels (ALMM is the government's Approved List of Models and Manufacturers, needed for subsidy), a branded inverter, a galvanised or aluminium structure sized for NCR dust-storm gusts, and full protection: DC and AC distribution boxes, surge protection, isolators, breakers and separate earth pits, with a lightning arrester where the roof needs one.

Once the plant is up, we run insulation and earthing tests, commission it, and follow the PVVNL net-metering process until the bi-directional meter is fitted. For homes we then track the PM Surya Ghar claim on the national portal and the UPNEDA state top-up, so both amounts reach your bank account.

Your inverter app shows live and daily generation. In Ghaziabad this is worth watching from October to February: if output drops sharply on a clear day, the panels probably need cleaning. Our AMC plans add scheduled inspections, connection tightening, inverter checks and a yearly performance report.

The same method scales from a 3 kW builder-floor roof to a 25 kW society terrace or a 150 kW factory shed in Sahibabad — measure the load, design for the roof, build it safely and stay available after handover.

See our detailed solar installation process →
Why us

Why Choose Fulminous Green Energy in Ghaziabad?

Choosing the right installer decides your system's safety, output and long-term savings. Here is what you can check before signing with us:

Clear Timelines

A written schedule for survey, installation, PVVNL inspection and net-meter fitting.

Engineer-Led Projects

One accountable team from design to commissioning.

Customised Design

Layouts designed around water tanks, mumties, neighbouring towers and your load.

Quality Equipment

ALMM-listed panels and branded inverters with manufacturer warranties.

Written Quotations

Itemised quotes listing equipment make, capacity, cost and both subsidies — no hidden charges.

Paperwork Handled

PM Surya Ghar, UPNEDA state subsidy and PVVNL net-metering coordination.

Society & RWA Support

Load data, layout drawings and proposals your RWA or co-owners need to approve a system.

Long-Term Support

AMC plans, monitoring and on-site service.

Our services

Our Solar Services in Ghaziabad

Fulminous Green Energy offers the full set of solar services in Ghaziabad — from designing a new system to keeping it running for 25 years.

Residential Solar

Rooftop solar for kothis, builder floors and villas in colonies such as Kavi Nagar, Raj Nagar and Vaishali.

Commercial & Industrial

Systems for schools, hospitals, showrooms, warehouses and factory sheds in Sahibabad, Meerut Road and Loni.

On-Grid / Off-Grid / Hybrid

On-grid for the best return on the PVVNL grid; hybrid if you want solar to replace a battery inverter or DG backup.

Maintenance & AMC

Cleaning schedules for the smog months, inverter checks, connection tightening and generation reports.

Battery Storage

Lithium-ion batteries for hybrid systems where summer power cuts affect your home or business.

Net Metering & Subsidy

PVVNL feasibility, inspection and meter fitting, plus PM Surya Ghar and UPNEDA subsidy guidance.

What we offer

Solar Solutions We Provide in Ghaziabad

One company for every solar requirement — homes, societies, businesses and industries.

Apartment & Society Solar

Common-area systems for lifts, pumps and lighting in group housing societies.

Solar for apartments →

Commercial Solar

For offices, shops, schools, hospitals and commercial buildings.

Commercial solar →

On-Grid Solar

Grid-connected systems with net metering — the lowest cost per unit and fastest payback.

On-grid + subsidy →

Hybrid & Off-Grid Solar

Solar with battery backup for power cuts, or independent systems where grid supply is weak.

Service & support →
For homes

Residential Rooftop Solar in Ghaziabad

For most Ghaziabad households, a 3–5 kW on-grid system can offset a large share of the monthly bill, especially in summer when air-conditioners run for long hours. We size the system from your last 12 months of PVVNL bills, check that the roof has enough shadow-free area (roughly 80–100 sq ft per kW), and confirm that your sanctioned load supports the capacity.

  • Kothis, builder floors, villas and row houses
  • Elevated structures that clear water tanks and parapets
  • PM Surya Ghar and UP state subsidy guidance
  • Written co-owner consent format for builder floors
Get a Home Solar Quote
For societies

Solar for Group Housing Societies in Ghaziabad

Much of Ghaziabad lives in high-rise societies — in Indirapuram, Vaishali, Vasundhara, Raj Nagar Extension, Crossings Republik and along NH-24. Solar on a society terrace usually powers common loads such as lifts, water pumps, corridor and parking lighting, which run in daylight and push up maintenance charges.

1. Common-load study

We read the society's common-area PVVNL bills to size a system to daytime lift, pump and lighting loads.

2. Terrace & tower check

Tower terraces are split by water tanks, lift rooms and dish antennas, so we map usable area tower by tower.

3. RWA proposal

A written proposal with generation, savings and maintenance plan for the managing committee or AGM.

For businesses

Commercial Solar for Ghaziabad Businesses

Commercial tariffs are higher than domestic tariffs, and most businesses use the bulk of their power in daylight — exactly when solar generates. In Ghaziabad that makes schools and coaching centres, hospitals and nursing homes, showrooms along the Meerut Road and NH-9 corridors, and warehouses strong candidates for rooftop solar.

  • 10 kW – 100 kW systems for daytime-heavy loads
  • Accelerated depreciation benefits (consult your CA)
  • Installation planned around business hours
  • Generation reports for ESG and sustainability disclosures
Get a Commercial Proposal
For industries

Industrial Solar EPC in Ghaziabad

Ghaziabad district has more than a dozen industrial estates with thousands of working units — steel and metal fabrication, garments and textiles, pharmaceuticals, electronics, auto parts, food processing, paper and packaging. Their metal-sheet sheds and steady daytime loads suit rooftop solar well. We deliver industrial solar as a turnkey EPC project — load analysis, structural check of sheds, design, HT/LT integration, approvals and commissioning.

  • 100 kW+ rooftop and ground-mount plants
  • Metal-shed mounting without roof leakage
  • Detailed generation and payback modelling before you commit
  • O&M contracts with cleaning plans for dusty industrial belts
Request an Industrial Site Audit

Get a Free Solar Site Survey in Ghaziabad

Speak to a solar consultant about the right system size, expected generation and your eligibility for both subsidies — no sales pressure, no obligation.

Sizing guide

Choose the Right Solar System Size

Check the monthly units on your latest PVVNL bill and match them below. Actual generation depends on orientation, shading, tilt, dust and local weather — your site survey gives the final figure.

Indicative figures at ~3.8–4.1 units/kW/day for Ghaziabad (Global Solar Atlas PV output ≈1,500 kWh/kWp/year, reduced slightly for smog-season soiling); lowest in December–January. Panel count assumes 440–550 Wp modules. Roof area is shadow-free area.
SystemSuitable forEst. monthly unitsRoof areaSanctioned load
1 kWLights, fans, TV, fridge115–125~100 sq ft1 kW+
2 kW2 BHK with 1 AC230–250~200 sq ft2 kW+
3 kW3 BHK floor, small shop or office345–375~300 sq ft3 kW+
5 kWKothi with 2–3 ACs575–625~500 sq ft5 kW+
6 kWLarge home, higher consumption690–750~600 sq ft6 kW+
10 kWLarge kothi, clinic, showroom1,150–1,250~1,000 sq ft10 kW+
15 kWSchool, society common area, office1,725–1,875~1,500 sq ft15 kW+
20 kW+Factory, warehouse, institution2,300+2,000+ sq ftAs per site

Solar System Size & Estimated Bill Offset Guide (Ghaziabad)

Illustrative only: estimated units × an assumed ₹6–7 per unit domestic energy charge, checked 30 Sep 2026. Your actual PVVNL slab rate, fixed charges and duty will differ. Your written quote gives the figure for your property.
System sizeIdeal forEst. monthly unitsApprox. monthly bill offset
1 kW – 2 kWSmall homes and 2 BHK floors115–250₹700 – ₹1,750
3 kW – 5 kWBuilder floors and mid-size kothis345–625₹2,050 – ₹4,350
6 kW – 10 kWLarge kothis, clinics, small shops690–1,250₹4,150 – ₹8,750
10 kW +Societies, schools, industrial units1,150+Depends on commercial / industrial tariff

Actual pricing depends on roof condition, brand selection and subsidy eligibility. Book a free site survey in Ghaziabad for an exact figure.

Inside the system

What Goes Into a Solar Power System

Every quotation from us names the make and specification of each component below, so you can compare like-for-like.

☀️ Panels

ALMM-listed mono-PERC, TOPCon or bifacial modules — the part that faces Ghaziabad's sun and smog.

⚡ Inverter

Turns panel DC into usable AC; on-grid, hybrid or off-grid depending on your backup needs.

🏗️ Structure

Galvanised or aluminium frame, raised to clear tanks and anchored against May–June storms.

🔗 Cabling

UV-rated DC cable on the roof and AC cable to the meter, sized for 45 °C summers.

📦 DCDB / ACDB

Enclosures that hold fuses, isolators and surge devices on each side of the inverter.

🛡️ Surge Protection

DC and AC SPDs that divert voltage spikes from lightning or grid switching.

🔌 Breakers

MCBs, MCCBs and isolators so the system can be switched off safely for service.

⏚ Earthing

Separate earth pits for the structure and electricals, plus a lightning arrester where needed.

📟 Bi-directional Meter

Fitted by PVVNL to record units bought and units exported.

📱 Data Logger & App

Shows generation live, so you notice a dust-related drop quickly.

🔋 Battery

Optional lithium-ion storage if you want to retire a lead-acid inverter setup.

🧹 Cleaning Points

A tap and safe walkway on the roof for weekly winter cleaning.

How it works

Our 6-Step Solar Installation Process in Ghaziabad

From your first call to a working system, here is exactly what happens:

  1. Consultation

    We review your PVVNL bills, usage pattern and goals — savings, backup or both.

  2. Site Assessment

    An engineer checks roof area, roof rights, orientation, shading from tanks and towers, structure and load.

  3. System Design & Quote

    You receive a layout, generation estimate and itemised written quotation showing both subsidies.

  4. Approvals & Installation

    We apply on the national portal for PVVNL feasibility, then install panels, structure, inverter and protection — typically in 1–3 days for homes.

  5. Testing & Commissioning

    Insulation, earthing and performance tests; PVVNL inspection and net-meter installation.

  6. Monitoring & Support

    App setup, warranty documents, subsidy follow-up with MNRE and UPNEDA, and ongoing AMC support.

Pricing

Solar Panel Installation Cost in Ghaziabad

There is no single price for solar, because every roof and every electricity bill is different. The cost of your system depends on these factors:

  • System capacity (kW)
  • Panel type & brand
  • Inverter type
  • Structure height
  • Battery requirement
  • Cable run & electrical work
  • PVVNL metering charges
  • Subsidy eligibility
  • Site conditions
  • GST

As a general guide, residential on-grid systems in Uttar Pradesh are priced per kW, with the per-kW cost reducing as system size increases. In Ghaziabad, two local factors often change the quote: how high the structure must be to clear water tanks, mumties and parapets, and how far the inverter and meter are from the roof in multi-storey builder floors. Society and industrial projects are priced after a detailed load study.

We do not publish a flat price because it would be inaccurate for most properties. Your written quote lists every component, its make and the final amount after both subsidies.

What your written quote includes

  • Panel make, model, wattage and quantity
  • Inverter make, model and capacity
  • Structure type and height
  • Cables, DCDB/ACDB, SPDs and earthing
  • Installation, transport and commissioning
  • Net-metering and documentation support
  • Warranty terms for each component
  • Central + UP subsidy and final effective cost
Get a Solar Quote for Your Property

See detailed guides: solar system cost · 3 kW cost · ROI calculator

Save more

Solar Subsidy and Government Support in Ghaziabad

Ghaziabad homes can stack a central subsidy and a UP state subsidy. Scheme rules and amounts change, so we confirm current eligibility during your consultation. Last verified: 30 September 2026.

Central scheme · Homes

PM Surya Ghar: Muft Bijli Yojana

For residential households. Central financial assistance is ₹30,000 per kW for the first 2 kW and ₹18,000 for the 3rd kW — up to ₹78,000 for systems of 3 kW and above, credited to the applicant's bank account after commissioning.*

Read the full guide →
State · Uttar Pradesh

UP State Rooftop Solar Subsidy

Under the UP Solar Energy Policy 2022, UPNEDA gives an additional ₹15,000 per kW, up to ₹30,000 per household, on top of PM Surya Ghar. It is offered for a limited number of households, so a slot is not guaranteed — we check availability before you apply.*

State-level subsidies →
Farmers

PM-KUSUM Scheme

Supports solar water pumps and grid-connected solar on agricultural land in rural Ghaziabad district, helping farmers replace diesel pumps. Component availability varies by state.

KUSUM guide →
Maximum amounts for eligible residential consumers. State amount applies only while UPNEDA slots are available. Verified 30 Sep 2026.
Home systemPM Surya Ghar (centre)UP state top-upMaximum combined
1 kW₹30,000₹15,000₹45,000
2 kW₹60,000₹30,000₹90,000
3 kW and above₹78,000₹30,000₹1,08,000

Who may qualify

  • Residential PVVNL consumers with a valid connection in their name
  • A roof suitable for solar (owned, or with owner / RWA consent)
  • Households that have not already availed a rooftop solar subsidy
  • Systems installed by a registered vendor using ALMM-listed panels

Group housing societies can claim central assistance for common facilities under the scheme's RWA provisions. Commercial and industrial properties are generally not eligible, but may benefit from depreciation.

Documents usually required

  • Latest PVVNL electricity bill (account number)
  • Aadhaar card and PAN of the applicant
  • Property ownership proof, or owner / co-owner / RWA NOC
  • Cancelled cheque / bank passbook
  • Recent photograph and roof photographs

Apply on the official portal pmsuryaghar.gov.in. We guide you through each step.

*Based on MNRE scheme guidelines and the UP Solar Energy Policy 2022 at the time of writing. Subsidy amounts, eligibility and process are decided by the government and may change.

Net metering

Net Metering for Rooftop Solar with PVVNL

Net metering lets your solar system work with the grid. When your panels produce more than you use, the surplus is exported and set off against the units you import at night or on smoggy days. You pay only for the net units.

  1. Solar panels
  2. Inverter
  3. Home / business loads
  4. Excess electricity
  5. Grid
  6. Net meter records flow

Net-metering steps in Ghaziabad

  1. Application on the national rooftop solar portal, routed to PVVNL
  2. Technical feasibility check by your PVVNL division
  3. System installation by the registered vendor
  4. PVVNL inspection and bi-directional meter installation
  5. Commissioning report, then central and state subsidy claims

Local notes

Ghaziabad is served by Paschimanchal Vidyut Vitran Nigam Ltd (PVVNL), headquartered in Meerut. Within the district, PVVNL works through urban distribution divisions in Ghaziabad city (including Khoda) and separate divisions for Loni, Modinagar and Muradnagar — your application goes to the division on your bill.

Rooftop solar in UP is governed by UPERC's RSPV Regulations 2019 (net and gross metering). Under the third amendment, in force from 5 July 2025, surplus energy left at the end of the settlement period is compensated at the previous year's weighted-average tariff of large competitively bid solar projects plus a 25% incentive. We confirm the rate that applies before you apply.

State rules & subsidies →
Location advantage

Why Rooftop Solar Makes Sense in Ghaziabad

Ghaziabad's biggest electricity bills come in April–September, when air-conditioners and coolers run for most of the day — and that is also when solar generation is strongest. Add the combined central and UP subsidy, and the case for a home system is strong despite the smoggy winter.

4.8kWh/m²/day solar radiation
≈1,500Units per kW per year
₹1.08 LMax combined home subsidy (3 kW)
27°Optimum panel tilt, south-facing

Sources: Global Solar Atlas (Ghaziabad city); MNRE; UP Solar Energy Policy 2022.

Summer Match

Solar output peaks in the same months your AC load peaks, so it cuts the most expensive part of the year's bills.

Tariffs & Slabs

PVVNL domestic bills follow UPERC's slab tariff, with higher rates for higher consumption. Solar pulls your usage into lower slabs and reduces the energy charge.

Long-Term Savings

Panels are warranted for 25 years of performance; after payback, most generation is savings.

Cleaner Air Share

Each kW of solar can offset roughly 1–1.3 tonnes of CO₂ a year compared with grid power — and replaces DG-set hours for many businesses.

Local guide

Solar Services in Ghaziabad: What to Know Before You Install

Practical, location-specific considerations our engineers check on every Ghaziabad project:

🌡️ Heat

Summer days in May and June can touch 45 °C, and panels lose some output as they heat up. We keep an air gap under the panels with an elevated structure and size cables for high ambient temperatures.

🌫️ Smog, Fog & Dust

From October to February, NCR smog and morning fog cut sunlight, and fine dust settles on panels within days. Weekly cleaning with plain water and a soft mop in these months recovers a noticeable share of lost generation.

💨 Dust Storms & Wind

Pre-monsoon dust storms in May and June bring sudden strong gusts. We design structures for the site's wind load as per IS 875 and anchor them firmly to the slab, not to loose blocks.

🏘️ Roof Rights

In builder floors the roof usually belongs to the top-floor owner; in societies it is common property managed by the RWA. Sorting out written consent early avoids the most common delay in Ghaziabad projects.

🏢 Shading from Towers

Low-rise homes next to high-rise societies can lose morning or evening sun. We map shading from neighbouring towers, water tanks and mobile towers across the year before fixing the layout.

⚡ Grid & Power Cuts

Ghaziabad is on the PVVNL grid. An on-grid system switches off during an outage for safety, so homes that already rely on a battery inverter often choose a hybrid system instead of running two separate setups.

Coverage area

Areas We Serve in and around Ghaziabad

We install rooftop solar across Ghaziabad city and these nearby areas. Tell us your locality when you call and we will confirm your survey date.

  • Ghaziabad City
  • Indirapuram
  • Vaishali
  • Vasundhara
  • Kaushambi
  • Raj Nagar & Raj Nagar Extension
  • Kavi Nagar
  • Crossings Republik
  • Govindpuram
  • Sahibabad
  • Loni
  • Modinagar
  • Muradnagar
FAQs

Frequently Asked Questions About Solar in Ghaziabad

What does a solar panel installation company in Ghaziabad do?

A solar panel installation company in Ghaziabad, such as Fulminous Green Energy, checks your PVVNL bill and roof, designs a system that fits a kothi terrace, builder-floor roof, society terrace or factory shed, supplies and installs the panels, inverter, structure and protection, and then handles the PVVNL net-metering steps and the PM Surya Ghar and UP state subsidy paperwork.

How much does solar panel installation cost in Ghaziabad?

There is no single price in Ghaziabad because the cost depends on system size, panel and inverter brand, structure height and cable length. Residential on-grid systems are quoted per kW and the per-kW cost falls as the system gets bigger. Eligible homes can reduce the cost through PM Surya Ghar (up to ₹78,000) and, while slots last, the UP state top-up of ₹15,000 per kW up to ₹30,000. We give an itemised written quote after a free site survey.

How do I choose the best solar company in Ghaziabad?

Check that the company is a registered vendor on the national rooftop solar portal for PVVNL, names ALMM-listed panel and inverter brands in an itemised quote, designs the structure for the dust storms of May and June, explains how it will handle roof rights in builder floors or societies, and puts its workmanship warranty and service response in writing.

Does Fulminous Green Energy install solar for both homes and businesses in Ghaziabad?

Yes. We install on-grid, hybrid and off-grid solar for independent houses and builder floors, group housing societies, schools, hospitals, showrooms, warehouses and factory sheds in industrial areas such as Sahibabad Site 4, Meerut Road and Loni.

Which solar system size is right for my home?

Divide your average monthly units by about 120, which is roughly what 1 kW of well-placed solar produces in a month in Ghaziabad after allowing for winter smog. A home using 360 units a month usually needs about 3 kW, and one using 600 units about 5 kW. Your sanctioned load and shadow-free roof area also set the upper limit.

Is solar subsidy available in Ghaziabad?

Yes. Homes with a PVVNL domestic connection can apply for PM Surya Ghar central financial assistance of ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW, capped at ₹78,000. Uttar Pradesh adds a state subsidy of ₹15,000 per kW up to ₹30,000 through UPNEDA for a limited number of households, so a 3 kW home system can receive up to ₹1,08,000 in total if a state slot is available. We confirm current availability before you apply.

How does net metering work with PVVNL?

You apply through the national rooftop solar portal, PVVNL checks technical feasibility, we install the system, and PVVNL inspects it and fits a bi-directional meter. Units exported to the grid are set off against units you import, and any surplus left at the end of the settlement period is compensated at the rate set by UPERC. UPERC revised this compensation rule in its third amendment, in force from 5 July 2025.

Can you help with government subsidy approval in Ghaziabad?

Yes. We guide eligible homes through the PM Surya Ghar application and the UPNEDA state subsidy, and handle the PVVNL steps — feasibility, inspection and meter fitting — so both subsidies can be released after commissioning.

How long does rooftop solar installation take?

Physical installation of a home system usually takes 1–3 days. The full process, including PVVNL feasibility approval, inspection and net-meter installation, typically takes a few weeks depending on the application queue. Society and industrial projects take longer because of RWA approvals and load studies.

Can I install solar in a Ghaziabad apartment or builder floor?

Usually yes, but roof rights come first. In a group housing society the terrace is common property, so the RWA must approve a common-area system or allocate space. In a builder floor the roof often belongs to the top-floor owner, so the other owners need a written agreement. We help you with the layout and paperwork once rights are clear.

How much roof space do I need for solar panels?

Plan for about 80–100 sq ft of shadow-free area per kW, so a 3 kW system needs roughly 250–300 sq ft. On Ghaziabad rooftops, water tanks, mumties, mobile towers and taller neighbouring buildings are the usual sources of shade, so we map shading before finalising the layout.

What warranty do I get on a solar system?

Solar panels usually carry a manufacturer product warranty of 10–12 years and a performance warranty of 25–30 years. Inverters typically carry 5–10 years depending on the brand. Our workmanship and structure warranty terms are written into your quotation, so you know exactly what is covered before you sign.

Does solar work during smog, fog and monsoon in Ghaziabad?

Yes, but output drops. From November to February, smog and morning fog cut sunlight and dust settles quickly on panels, so generation is lower and regular cleaning matters most. The monsoon from late June to late September brings cloudy days too. Across the year a well-placed system still averages about 4.1 units per kW per day on Global Solar Atlas data.

Do you provide maintenance after installation?

Yes. After handover we set up app-based monitoring and offer annual maintenance (AMC) plans that include inverter health checks, connection tightening, earthing checks and generation reports. In Ghaziabad we suggest weekly cleaning in the smog and dust months from October to February and after dust storms in May and June.

Quick answers

Common Solar Questions from Ghaziabad Homeowners

Short, direct answers to what people most often ask before going solar. Each links to a detailed guide.

Which solar company should I choose in Ghaziabad?

Choose a registered vendor that names ALMM-listed brands in a written quote, handles PVVNL and both subsidies, and can show how it deals with roof rights and dust-storm anchoring. Checklist →

What does rooftop solar cost?

It is priced per kW; the per-kW rate drops for bigger systems and rises with taller structures or long cable runs. Cost guide →

What does a 3 kW system cost after subsidy?

3 kW is where both subsidies max out — up to ₹78,000 central plus up to ₹30,000 from UP if a slot is available. 3 kW guide →

Is 5 kW worth it over 3 kW?

If your summer bills exceed about 600 units a month, yes; subsidy stays capped at the 3 kW level, but generation keeps rising. 5 kW guide →

How much does a 5 kW system generate here?

About 575–625 units a month on average in Ghaziabad, more in April–June and less in December–January.

Does solar pay back in Ghaziabad?

For homes with high summer AC use and both subsidies, payback typically comes within a few years of a 25-year panel life. ROI calculator →

How is the subsidy paid?

After commissioning and PVVNL meter fitting, the central amount and any UP top-up are transferred to the applicant's bank account.

What happens to extra units I export?

They are set off against units you import; any surplus at the end of the settlement period is compensated under UPERC rules.

Which inverter should I pick?

On-grid for pure savings, hybrid if you want solar to back up lights and fans during cuts, off-grid only where there is no dependable supply.

Why does an on-grid system stop during a power cut?

For line-worker safety it must not feed a dead grid, so it shuts down until PVVNL supply returns.

Can I keep my existing battery inverter?

It can run alongside on-grid solar, but a single hybrid inverter is usually tidier and charges the battery from the sun.

How much roof do I need?

About 80–100 sq ft of unshaded roof per kW, so a 3 kW plant needs roughly 250–300 sq ft.

How long from order to working system?

Fitting takes 1–3 days for a home; PVVNL feasibility, inspection and meter fitting add a few weeks.

How much will my bill fall?

A well-sized system can remove most of the energy charge; fixed charges and night use beyond your credits remain.

Buyer's checklist

7 Things to Check Before Hiring a Solar Installer

Use this list to compare any solar company in Ghaziabad — including us.

  • Is the vendor registered on the national rooftop solar portal for PVVNL?
  • Are panels ALMM-listed, and is the make named in the quote?
  • Is the structure galvanised, and what wind load is it designed for?
  • Are SPDs, isolators and dedicated earthing included?
  • Who handles PVVNL net metering and both subsidy applications?
  • What are the product, performance and workmanship warranties?
  • Who responds, and how fast, if something stops working?
Peace of mind

Warranty & Support at a Glance

ItemTypical coverageProvided by
Solar panels – productTypically 10–12 years (as per datasheet)Panel manufacturer
Solar panels – performanceUp to 25–30 years (as per datasheet)Panel manufacturer
InverterTypically 5–10 years, depending on brandInverter manufacturer
Installation workmanshipAs stated in your written quotationFulminous Green Energy
StructureAs stated in your written quotationFulminous Green Energy / supplier
Maintenance (AMC)Optional annual plansFulminous Green Energy
Explore more

Solar Services & Guides

Last updated: · Solar resource data: Global Solar Atlas (Ghaziabad city). Subsidy, tariff and net-metering information is checked against MNRE, UPNEDA, UPERC and PVVNL sources and may change.

Ready to switch?

Ready to Switch to Solar in Ghaziabad?

Get professional guidance on selecting and installing a solar power system for your home, society, business or industrial property — with a free site survey and a written quote.

We also install solar in these NCR and nearby cities

Noida • Delhi • Gurugram • Faridabad • Meerut • Bareilly • Agra • Lucknow

Scroll to Top

Areas We Serve Across Rajasthan

Solar panel installation & consultation services available in these districts: